Induction training · Hydraulic cylinder plant

From steel bar to finished hydraulic cylinder

Every cylinder we build starts as plain steel bars and tubes arriving at the gate. Over twenty operations in eight production buildings it becomes a tested, painted cylinder, ready for a customer's excavator, tractor, crane or tipper truck. Press play to follow one cylinder through the whole plant, or click any operation on the route card to jump to it.

0.0 s
Step 1Intro

Welcome to the plant

Know the cylinder you are building

Oil pumped into the base-end port pushes the piston and the rod moves out. Oil pumped into the rod-end port pulls it back in. The highlighted parts are the ones being worked on at the current step.

Oil port (base end) Piston seal Tube (barrel) Oil port (rod end) Rod seal & wiper Base & clevis Piston nut Piston Gland Piston rod Rod eye

Quality checks along the way

StageWhat is checkedHow
IncomingChemistry, hardness, size, MTCSpectrometer, hardness tester, vernier
Induction hardeningSurface hardness 55–60 HRC, case depthRockwell tester, cut sample
GrindingDiameter, roundness, straightnessMicrometer, dial gauge on V-blocks
Chrome platingLayer 20–25 µm, hardness, adhesionCoating thickness gauge
PolishingRoughness Ra ≤ 0.2 µmSurface roughness tester
Tube boreØ80 H8, Ra ≤ 0.4 µm, straightnessBore gauge, roughness tester
WeldingCracks, porosity, penetrationVisual, dye penetrant, cut-and-etch
MachiningThreads, grooves, first-off partRing and plug gauges, CMM
AssemblyCleanliness, seal fitment, torquePatch test, checklist, torque tools
TestingLeaks at 375 bar, drift, smooth strokeTest bench, test report
PaintFilm thickness 60–80 µm, adhesionDFT gauge, cross-cut test

The values on this page are for the example job. The drawing and work instruction for your part always set the real limits.

Safety rules in every building

  1. Wear safety shoes and glasses from the moment you step on the shop floor. Add the PPE shown at each station.
  2. Walk only inside the yellow walkway lines. Watch for forklifts and never stand under a crane load.
  3. Tie long hair back. Tuck in loose clothing, scarves, dupattas and ID lanyards near any machine.
  4. No gloves near rotating chucks, spindles or drills. A glove can be caught and pull your hand in.
  5. Never remove a guard or reach into a running machine. A machine under repair is locked out and tagged (LOTO).
  6. Report every near miss, spill or unsafe condition to your supervisor straight away.
  7. Know your emergency exits, assembly point, eye-wash stations and first-aid box.

Words you will hear

MTCMill Test Certificate: the steel maker's report of chemistry and strength.
Heat no.Batch number of the steel melt, used to trace every part.
Route cardTravel document listing each operation; signed off as the job moves.
FIFOFirst in, first out: use the oldest material in stores first.
First-offThe first part of a batch, checked by QC before the rest are made.
µmMicron: a thousandth of a millimetre. A hair is about 70 µm.
RaSurface roughness. Smaller is smoother.
HRCRockwell C hardness scale.
barPressure unit. 250 bar is about 250 kg pressing on every cm².
NCRNon-conformance report, raised when a part is out of limits.
5SSort, set in order, shine, standardise, sustain.
Poka-yokeA mistake-proofing fixture or check that makes errors impossible.

Building numbers, the site layout and the process values are illustrative. Your unit's layout, work instructions and drawings always come first.